M
MercyNews
Home
Back
Man Uses Backpack to Help Shelter Dogs Get Adopted
Society

Man Uses Backpack to Help Shelter Dogs Get Adopted

ABC NewsJan 10
3 min read
📋

Key Facts

  • ✓ A man is going viral for using a special backpack to help get shelter dogs adopted.
  • ✓ ABC News' Danny New reported on the story.

In This Article

  1. Quick Summary
  2. The Viral Initiative
  3. Media Coverage and Impact
  4. The Importance of Adoption
  5. Conclusion

Quick Summary#

A man is currently going viral for his innovative method of helping shelter dogs find permanent homes. Utilizing a specially designed backpack, the individual has drawn significant attention to the cause of animal adoption. The unique approach allows the dogs to accompany him in a comfortable and visible manner, effectively increasing their exposure to potential adopters.

This heartwarming story highlights creative solutions to the ongoing challenge of overcrowding in animal shelters. By bringing the dogs directly into public view in a safe and portable way, the man is facilitating connections between abandoned animals and loving families. The viral nature of the story underscores the public's interest in positive community initiatives and animal welfare.

The Viral Initiative#

An individual has captured the attention of the public by employing a unique strategy to assist shelter dogs. The method involves the use of a specific backpack designed to carry the animals safely while they are out in the community. This initiative serves as a mobile adoption event, bringing the dogs directly to the people rather than waiting for people to visit the shelter.

The visibility of the dogs in such a portable format has proven to be highly effective. It allows for immediate interaction and creates a talking point that draws interest from passersby. This approach represents a proactive stance on animal adoption, moving beyond traditional shelter confines to reach a broader audience.

"A man is going viral for using a special backpack to help get shelter dogs adopted."

— Source Content

Media Coverage and Impact#

The story has gained traction, with ABC News reporting on the phenomenon. Reporter Danny New covered the story, helping to spread the word about this compassionate effort. The involvement of a major news outlet has amplified the message, reaching a wide demographic and inspiring others to think creatively about how they can contribute to animal welfare.

The viral spread of the story demonstrates the power of media to highlight positive social actions. It brings focus to the reality of shelter animals and the various ways they can be showcased to potential adopters. The coverage emphasizes the human element of the story, focusing on the dedication of individuals willing to go the extra mile for animals in need.

The Importance of Adoption#

Stories like this highlight the critical need for pet adoption. Shelters across the country face immense pressure to house and care for abandoned animals. Creative methods to increase visibility are essential in reducing the number of animals that remain without a home for extended periods.

Adoption not only saves the life of the animal but also frees up resources for shelters to help other animals in need. The viral backpack story serves as a reminder that individual actions can have a significant collective impact. It encourages the community to engage with local shelters and explore how they can support these vital organizations.

Conclusion#

The viral success of the man using a backpack to help shelter dogs is a testament to the power of innovation in social causes. By combining practicality with a high-visibility approach, he has managed to spark a conversation about animal adoption on a national level. The reporting by ABC News and Danny New has solidified the story's place in the public consciousness.

Ultimately, this story offers a hopeful perspective on how simple ideas can lead to significant results. It reinforces the idea that everyone has the potential to make a difference in the lives of animals. As the story continues to circulate, it will likely inspire further acts of kindness and creativity in the realm of animal rescue.

#Lifestyle

Continue scrolling for more

AI Transforms Mathematical Research and Proofs
Technology

AI Transforms Mathematical Research and Proofs

Artificial intelligence is shifting from a promise to a reality in mathematics. Machine learning models are now generating original theorems, forcing a reevaluation of research and teaching methods.

Just now
4 min
172
Read Article
Lyon Pilgrimage Agency Collapses, Stranding Travelers
Economics

Lyon Pilgrimage Agency Collapses, Stranding Travelers

A specialized pilgrimage agency in Lyon has suddenly disappeared, leaving clients with canceled trips to Mecca and no refunds. The company cites 'exceptional circumstances' as hundreds of travelers face uncertainty.

3d
5 min
5
Read Article
Cryptocurrency

JPMorgan CFO Warns of Stablecoin Yield Dangers

A top JPMorgan executive has raised alarms about the rapid growth of stablecoin yields, describing the trend as a 'dangerous and undesirable thing' that could destabilize traditional finance.

3d
5 min
5
Read Article
Saks Global Files for Chapter 11 Bankruptcy
Economics

Saks Global Files for Chapter 11 Bankruptcy

Saks Global, the parent company of iconic department stores Saks Fifth Avenue, Neiman Marcus, and Bergdorf Goodman, has filed for Chapter 11 bankruptcy protection in Texas.

3d
5 min
2
Read Article
Trump Warns Iran Over Protest Executions
Politics

Trump Warns Iran Over Protest Executions

As Iran prepares to execute another protester, Donald Trump has issued a stark warning of severe consequences. With the death toll from ongoing demonstrations reportedly exceeding 2,400, international pressure mounts on Tehran.

3d
5 min
6
Read Article
Special Schools vs. Inclusion: The Education Dilemma
Education

Special Schools vs. Inclusion: The Education Dilemma

The principle of inclusive education faces a critical test as families question whether mainstream classrooms truly serve students with disabilities. A growing conversation challenges the one-size-fits-all approach, suggesting that specialized environments may offer superior outcomes for certain learners.

3d
5 min
11
Read Article
Bare Knuckle Fighting Championship Launches in India
Sports

Bare Knuckle Fighting Championship Launches in India

The world's fastest-growing combat sport arrives in India as Bare Knuckle Fighting Championship announces its official expansion. Bollywood star Tiger Shroff joins the venture, bringing massive star power to this historic market entry.

3d
5 min
11
Read Article
Politics

Death toll from Iran's crackdown on protests jumps to at least 2,571, activists say

The figure analysts say dwarfs the death toll from any other round of protest or unrest in Iran in decades and recalls the chaos surrounding the country’s 1979 Islamic Revolution.

3d
3 min
0
Read Article
Tempest: American Missile Buggy Scores 20+ Kills in Ukraine
World_news

Tempest: American Missile Buggy Scores 20+ Kills in Ukraine

A new American off-road buggy equipped with guided missiles has entered service in Ukraine, where crews report significant success against Russian drone threats. The Tempest system offers mobile air defense against Shahed loitering munitions.

3d
5 min
6
Read Article
Read Jerome Powell's letter to senators following his testimony about renovations to the Fed building
Politics

Read Jerome Powell's letter to senators following his testimony about renovations to the Fed building

Jerome Powell, a particularly mild-mannered speaker, slammed recent attempts to intimidate his department. Li Yuanqing/Xinhua via Getty Images The DOJ is probing Jerome Powell over his congressional testimony about the Fed building renovations. Powell sent a letter, dated July 14, 2025, to senators about the renovations. The letter provided expansive detail about the Fed building's history, repairs, and budget. Federal Reserve Chair Jerome Powell sent a letter dated July 14, 2025, to key senators on the Banking, Housing, and Urban Affairs Committee, following his testimony before Congress about renovations to the central bank buildings. In it, the Fed chair gave lawmakers a detailed and expansive response to inquiries about the renovations. Powell's letter to the Senate Banking Committee, obtained by Business Insider, was sent 10 days before giving President Donald Trump and other White House officials a tour of the renovation site on July 24, 2025. Powell announced via video message on January 11 that the Department of Justice served grand jury subpoenas to the Federal Reserve. He said the probe is into his June testimony about renovations at historic Fed office buildings, but warned that it was a pressure tactic over interest rates. "This is about whether the Fed will be able to continue to set interest rates based on evidence and economic conditions — or whether instead monetary policy will be directed by political pressure or intimidation." Rep. Anna Paulina Luna accused Powell of misleading Congress and sent a criminal referral to the Justice Department, though it's unclear whether that prompted the DOJ investigation. The letter to Sen. Tim Scott, chairman of the committee, and Sen. Elizabeth Warren, the ranking member, outlines the history of the Fed's Washington, DC, buildings, offers details about the repairs and working conditions, and provides information about the cost of the project's budget. The letter was first reported by the Financial Times. Powell wrote that the Federal Reserve Board "believes it is of the utmost importance to provide transparency for our decisions and to be accountable to the public through the Congress for our work." During Powell's testimony in June, Scott said the Fed's more than $2 billion renovation of its headquarters was excessive and likened it to the "Palace of Versailles." Powell responded that many features Scott mentioned no longer exist, such as beehives, a VIP elevator, and water features, but added that the Marriner S. Eccles Building urgently needed safety upgrades and hadn't been meaningfully renovated before work began in 2022. The White House and the Federal Reserve Board did not immediately respond to a request for comments. Read the full letter: Dear Chairman Scott and Ranking Member Warren: I am writing to follow up on your interest in the Federal Reserve Board's (Board) Marriner S. Eccles Building (Eccles Building) and 1951 Constitution Avenue Building project. The Board believes it is of the utmost importance to provide transparency for our decisions and to be accountable to the public through the Congress for our work. We take seriously our commitment to transparency. We respect the critical importance of the constitutionally-derived congressional oversight of our activities, and we are committed to working collaboratively and cooperatively with you. In advance of Board staff discussing the project in further detail with your staff as you have requested, I wanted to share a set of frequently asked questions (FAQs) about the project and provide you with additional information. The FAQs address the project goals, engagement with state and federal entities, cost drivers, and various features of the project. The FAQs are enclosed and are also on our public website.1 For historical perspective, the Eccles Building was constructed between 1935 and 1937 as the headquarters for the Federal Reserve Board. The 1951 Constitution Avenue Building was constructed in 1932 for the U.S. Public Health Service. Over its history, it housed a variety of government agencies, including the Combined Chiefs of Staff during World War II, the Atomic Energy Commission, the National Science Foundation, and the Department of the Interior. Both buildings are listed in the District of Columbia Inventory of Historic Sites, and the 1951 Constitution Avenue Building is listed on the National Register of Historic Places. While periodic work has been done to keep the buildings occupiable, neither building has seen a comprehensive renovation since they were constructed. For some time, significant structural repairs and other updates were needed for the Eccles Building. Similarly, the vacant and dilapidated 1951 Constitution Avenue Building, across the street from the Eccles Building, needed significant repairs and updating. Despite its condition, the 1951 Constitution Avenue Building provided an opportunity for the Board to consolidate its operations and reduce expenses over time on leased space in commercial office buildings elsewhere. In 2017, the General Services Administration (GSA) approached us about our interest in taking over the 1951 Constitution Avenue Building. In 2018, GSA transferred sole control of the 1951 Constitution Avenue Building to the Board. In a press release announcing the transfer in 2018, GSA's Public Buildings Service Commissioner stated "This transfer will put a vacant building back in productive use, allow the Federal Reserve Board to consolidate several leases and result in savings for taxpayers."2 To address the significant state of disrepair and unsafe working conditions, the Board is undertaking a complete overhaul and modernization of these two historic buildings. This includes remediation and updates to make the buildings safe, healthy, and effective places to work by removing asbestos and lead contamination and accommodating modern workplace technology. The project has also involved the complete replacement of antiquated systems that are beyond their useful life, such as electrical; plumbing; heating, ventilation, and air conditioning; and fire detection and suppression systems. As part of the project, the Board has undertaken major structural work to bring the buildings up to modern code, including current accessibility, security, and safety standards. Throughout the process, the Board chose to consult with a range of state and federal agencies including the Commission on Fine Arts, the District of Columbia's Public Space Committee and its State Historic Preservation Office, the National Park Service, and the National Capital Planning Commission (NCPC). As discussed in the enclosed FAQs, although the Board is generally not subject to the jurisdiction of the NCPC, historically the Board has submitted building project designs to the NCPC and worked with the NCPC to address their feedback. In recognition of the historic nature of both buildings and their prominent location on the National Mall, the project identified key architectural features to preserve the historic integrity of the buildings, such as stonework, including marble, façades, meeting rooms, and other spaces. Historic preservation work in the Eccles Building also includes elevators that are original to the building, and historic conference rooms. Construction involving the preservation of historic spaces requires specialized processes and methods, which are generally more complex and have increased costs compared with new construction or renovation of spaces that are not historically significant or located on the National Mall. Various factors drove cost increases following the NCPC's final approval of site and building plans in 2021. These factors include differences over time between original estimates and actual costs of materials, equipment, and labor, and unforeseen conditions in the properties, such as more asbestos than anticipated, toxic contamination in the soil, and a higher-than- expected water table. As is to be expected in the major renovation of nearly 100-year-old historic buildings, the Board's designs have continued to evolve over the course of the project, and some features of the buildings, including rooftop spaces and new water features on the building grounds, were scaled back or eliminated as the project moved forward. These changes simplified the project and reduced the likelihood of further delays and cost overruns. None of them added cost to the project. We do not consider these changes to be substantial. With respect to the specific concerns that were discussed at the hearing, I would like to provide additional detail regarding various elements of the project: • The Eccles and 1951 Constitution Avenue buildings were originally built with marble in the façades and stonework. The project has salvaged the original exterior marble to be reinstalled and will use new domestic marble sourced from Georgia in places where the original was damaged or where needed to keep with historic preservation guidelines and to address concerns raised by external review agencies. • The original elevators are being rehabilitated, including an elevator that services historic conference rooms. A short (eighteen inch) extension of this rehabilitated elevator will make the space more accessible for people with disabilities. There are no elevators where access is limited to governors. There are no VIP dining rooms being constructed as part of the project. The Eccles Building has historic multi-use rooms that are used as conference rooms and for mealtime meetings, which are being renovated and preserved. • Although the Board's initial design included new water features for 1951 Constitution Avenue, they have been eliminated. Fountains that were original to the Eccles Building are being restored. • The ground-level front lawn of 1951 Constitution Avenue serves as the roof of the parking structure beneath. It was referred to as a "garden terrace" in the 2021 submission to the National Capital Planning Commission. There are other references to "vegetated roofs," often referred to as green roofs, which are commonly used to help with stormwater management and to increase building efficiency and roof longevity. Green roofs are found on other federal government buildings, like the Departments of Justice, Interior, and many others, and are encouraged by the General Services Administration.3 We take seriously the responsibility to be good stewards of public resources as we fulfill the duties given to us by Congress on behalf of the American people. We have taken great care to ensure the project is carefully overseen since it was first approved by the Board in 2017. The project has been subject to annual budget approval by the Board since then. In addition to oversight by members of the Board, our independent Inspector General (IG) has had full access to project information on costs, contracts, schedules, and expenditures and receives monthly reports on the construction program. The Board's IG conducted an audit in 2021 to assess the Board's process for planning and managing multiple renovation projects as well as procuring services under various renovation-related contracts. I have asked the Board's IG to take a fresh look at the project. I hope you find this additional information helpful. Sincerely, Jerome H Powell Read the original article on Business Insider

3d
3 min
0
Read Article
🎉

You're all caught up!

Check back later for more stories

Back to Home