M
MercyNews
Home
Back
Hong Kong Police Arrest 16th Suspect in Tai Po Blaze
Crime

Hong Kong Police Arrest 16th Suspect in Tai Po Blaze

South China Morning PostDec 24
3 min read
📋

Key Facts

  • ✓ Hong Kong police made their 16th arrest in connection with the Tai Po blaze
  • ✓ The 48-year-old suspect was arrested in Tin Shui Wai on suspicion of manslaughter
  • ✓ He was the person in charge of the external wall at Wang Fuk Court
  • ✓ The fire killed 161 people and displaced nearly 5,000 residents
  • ✓ Seven of eight scaffolding-clad buildings were engulfed on November 26

In This Article

  1. Quick Summary
  2. Latest Arrest Details
  3. The Tai Po Tragedy
  4. Investigation Progress
  5. Community Impact

Quick Summary#

Hong Kong police have made their 16th arrest in connection with the deadly Tai Po blaze, detaining a 48-year-old man on suspicion of manslaughter. The arrest occurred in Tin Shui Wai, adding to the growing list of individuals being investigated following the catastrophic fire.

The suspect was identified as the person in charge of the external wall at the housing estate. This development comes after police previously arrested 15 people in connection with the fire that devastated the Wang Fuk Court housing estate on November 26. The tragedy resulted in 161 deaths and displaced almost 5,000 residents, making it one of the deadliest residential fires in recent Hong Kong history.

Latest Arrest Details#

Police confirmed the arrest of a 48-year-old man in Tin Shui Wai on Wednesday. The suspect was taken into custody on suspicion of manslaughter in connection with the Tai Po fire. He is believed to have been the person in charge of the external wall at the Wang Fuk Court housing estate.

This arrest represents the 16th individual detained as part of the ongoing investigation. Authorities have been systematically identifying and apprehending individuals potentially responsible for the deadly blaze. The investigation focuses on determining liability for the fire that claimed 161 lives and left thousands homeless.

The Tai Po Tragedy 🏢#

The fire broke out on November 26 at the Wang Fuk Court housing estate in Tai Po. The blaze rapidly engulfed seven of eight residential buildings that were covered in scaffolding. The intensity of the fire spread quickly across the complex, creating a catastrophic situation for residents trapped inside.

The human toll was devastating:

  • 161 fatalities recorded
  • Almost 5,000 residents displaced
  • Seven buildings destroyed
  • Complete evacuation required

The housing estate consisted of eight buildings total, with seven being completely consumed by flames. The scaffolding surrounding the structures likely contributed to the rapid spread of the fire, creating pathways for flames to move between buildings.

Investigation Progress#

The investigation has been ongoing since the immediate aftermath of the fire. Police have now arrested a total of 16 individuals in connection with the tragedy. The systematic approach to arrests suggests a comprehensive investigation into multiple potential points of failure or negligence.

The progression of arrests demonstrates:

  1. Initial response and evidence gathering
  2. Identification of key personnel
  3. Sequential arrests based on responsibility levels
  4. Continued expansion of the investigation

Each arrest provides investigators with additional information about the circumstances leading to the fire. The manslaughter suspicion indicates authorities believe there may have been criminal negligence or actions that directly contributed to the loss of life.

Community Impact#

The Wang Fuk Court disaster has had profound effects on the local community. With nearly 5,000 residents displaced, the housing crisis has been compounded by the emotional trauma of losing homes and neighbors. The scale of displacement required emergency housing arrangements and extensive support services.

The tragedy has raised questions about building safety and fire prevention measures in high-density residential complexes. The presence of scaffolding on multiple buildings has drawn attention to construction safety protocols and emergency evacuation procedures. The community continues to grapple with the aftermath while awaiting answers about how such a devastating loss of life could occur.

Continue scrolling for more

Suspect in Melbourne Synagogue Firebombing Arrested in Iraq
Crime

Suspect in Melbourne Synagogue Firebombing Arrested in Iraq

A man wanted in connection with the firebombing of a Melbourne synagogue has been arrested in Iraq. Australian authorities identified him as a national security threat and a top priority target.

1h
5 min
12
Read Article
Politics

Trump Escalates Feud with Fed Chair Jerome Powell

The President's latest verbal assault on the Federal Reserve Chairman marks a significant escalation in tensions over monetary policy and central bank independence.

1h
5 min
10
Read Article
Denúncia anônima deu início a investigação sobre desvios milionários no São Paulo, diz delegado
Sports

Denúncia anônima deu início a investigação sobre desvios milionários no São Paulo, diz delegado

O São Paulo decide esta semana se mantém ou afasta o presidente. Uma denúncia anônima foi o ponto de partida para a investigação da Polícia Civil que apura suspeitas de desvios financeiros milionários no São Paulo Futebol Clube. Segundo Tiago Correia, delegado responsável pelo caso, a informação levou à abertura de um inquérito policial para apurar indícios de crimes como associação criminosa, apropriação indébita e furto qualificado. "Nós recebemos uma denúncia dando conta de que havia uma série de desvios estruturados e sistemáticos no âmbito do São Paulo Futebol Clube", diz Tiago Correia, o delegado responsável pela investigação. A partir disso, a polícia deu início à apuração formal e acionou o Conselho de Controle de Atividades Financeiras (Coaf) para analisar movimentações consideradas atípicas nas contas do São Paulo. O relatório do Coaf apontou a realização de 35 saques em dinheiro vivo entre 2021 e 2025, que, juntos, somaram R$ 11 milhões. Os dois primeiros saques, no valor total de R$ 600 mil, foram feitos por um ex-funcionário do clube diretamente na boca do caixa. Depois, o São Paulo passou a utilizar empresas de transporte de valores, os chamados carros-fortes, para retirar o dinheiro. LEIA TAMBÉM: Investigação apura 'desvios estruturados e sistemáticos' no São Paulo, diz delegado Estádio do Morumbi. Reprodução/TV Globo/Fantástico Segundo a investigação, o departamento financeiro do clube informava previamente ao banco sobre os saques de alto valor, e os recursos eram levados para a tesouraria. Ao todo, 33 retiradas ocorreram com o uso de carros-fortes, procedimento que, de acordo com o delegado, dificulta o rastreamento da destinação final do dinheiro. O ano de 2024 concentrou a maior parte das movimentações, com 11 saques. Já em 2025, foram identificadas cinco retiradas que somaram cerca de R$ 1,7 milhão. Para a polícia, o principal foco agora é esclarecer por que o clube optou por grandes saques em espécie e quem recebeu os valores ao final do processo. Um dos dirigentes citados no inquérito é Nelson Marques Ferreira, que ocupou o cargo de diretor adjunto entre 2021 e novembro de 2024. LEIA TAMBÉM: Saques com carros-fortes deixaram rombo de R$ 11 milhões no São Paulo, diz investigação; entenda esquema A investigação aponta que ele teria adquirido cerca de 15 franquias comerciais em um curto período, o que levou à ampliação da apuração e ao acionamento do Coaf também em relação a pessoas físicas ligadas ao caso. O inquérito ainda analisou movimentações financeiras da conta conjunta do presidente do clube, Júlio Casares, com a ex-esposa, Mara Casares. O relatório do Coaf aponta depósitos de R$ 1 milhão em dinheiro vivo entre 2023 e 2025, feitos de forma fragmentada. A polícia afirma, no entanto, que não há ligação direta entre esses depósitos e os saques realizados pelo São Paulo. O que dizem as defesas Em nota, a defesa de Júlio Casares disse que os valores têm origem lícita e que o presidente determinou a atuação do setor de compliance do clube para apurar eventuais irregularidades. O advogado do São Paulo também ressaltou que o clube não é alvo da investigação e que todos os valores sacados em espécie estão devidamente contabilizados, sendo usados para despesas como pagamento de arbitragem e premiações por desempenho. Ouça os podcasts do Fantástico ISSO É FANTÁSTICO O podcast Isso É Fantástico está disponível no g1 e nos principais aplicativos de podcasts, trazendo grandes reportagens, investigações e histórias fascinantes em podcast com o selo de jornalismo do Fantástico: profundidade, contexto e informação. Siga, curta ou assine o Isso É Fantástico no seu tocador de podcasts favorito. Todo domingo tem um episódio novo. PRAZER, RENATA O podcast 'Prazer, Renata' está disponível no g1 e nos principais aplicativos de podcasts. Siga, assine e curta o 'Prazer, Renata' na sua plataforma preferida.

2h
3 min
0
Read Article
Read Jerome Powell's letter to senators following his testimony about renovations to the Fed building
Politics

Read Jerome Powell's letter to senators following his testimony about renovations to the Fed building

Jerome Powell, a particularly mild-mannered speaker, slammed recent attempts to intimidate his department. Li Yuanqing/Xinhua via Getty Images The DOJ is probing Jerome Powell over his congressional testimony about the Fed building renovations. Powell sent a letter, dated July 14, 2025, to senators about the renovations. The letter provided expansive detail about the Fed building's history, repairs, and budget. Federal Reserve Chair Jerome Powell sent a letter dated July 14, 2025, to key senators on the Banking, Housing, and Urban Affairs Committee, following his testimony before Congress about renovations to the central bank buildings. In it, the Fed chair gave lawmakers a detailed and expansive response to inquiries about the renovations. Powell's letter to the Senate Banking Committee, obtained by Business Insider, was sent 10 days before giving President Donald Trump and other White House officials a tour of the renovation site on July 24, 2025. Powell announced via video message on January 11 that the Department of Justice served grand jury subpoenas to the Federal Reserve. He said the probe is into his June testimony about renovations at historic Fed office buildings, but warned that it was a pressure tactic over interest rates. "This is about whether the Fed will be able to continue to set interest rates based on evidence and economic conditions — or whether instead monetary policy will be directed by political pressure or intimidation." Rep. Anna Paulina Luna accused Powell of misleading Congress and sent a criminal referral to the Justice Department, though it's unclear whether that prompted the DOJ investigation. The letter to Sen. Tim Scott, chairman of the committee, and Sen. Elizabeth Warren, the ranking member, outlines the history of the Fed's Washington, DC, buildings, offers details about the repairs and working conditions, and provides information about the cost of the project's budget. The letter was first reported by the Financial Times. Powell wrote that the Federal Reserve Board "believes it is of the utmost importance to provide transparency for our decisions and to be accountable to the public through the Congress for our work." During Powell's testimony in June, Scott said the Fed's more than $2 billion renovation of its headquarters was excessive and likened it to the "Palace of Versailles." Powell responded that many features Scott mentioned no longer exist, such as beehives, a VIP elevator, and water features, but added that the Marriner S. Eccles Building urgently needed safety upgrades and hadn't been meaningfully renovated before work began in 2022. The White House and the Federal Reserve Board did not immediately respond to a request for comments. Read the full letter: Dear Chairman Scott and Ranking Member Warren: I am writing to follow up on your interest in the Federal Reserve Board's (Board) Marriner S. Eccles Building (Eccles Building) and 1951 Constitution Avenue Building project. The Board believes it is of the utmost importance to provide transparency for our decisions and to be accountable to the public through the Congress for our work. We take seriously our commitment to transparency. We respect the critical importance of the constitutionally-derived congressional oversight of our activities, and we are committed to working collaboratively and cooperatively with you. In advance of Board staff discussing the project in further detail with your staff as you have requested, I wanted to share a set of frequently asked questions (FAQs) about the project and provide you with additional information. The FAQs address the project goals, engagement with state and federal entities, cost drivers, and various features of the project. The FAQs are enclosed and are also on our public website.1 For historical perspective, the Eccles Building was constructed between 1935 and 1937 as the headquarters for the Federal Reserve Board. The 1951 Constitution Avenue Building was constructed in 1932 for the U.S. Public Health Service. Over its history, it housed a variety of government agencies, including the Combined Chiefs of Staff during World War II, the Atomic Energy Commission, the National Science Foundation, and the Department of the Interior. Both buildings are listed in the District of Columbia Inventory of Historic Sites, and the 1951 Constitution Avenue Building is listed on the National Register of Historic Places. While periodic work has been done to keep the buildings occupiable, neither building has seen a comprehensive renovation since they were constructed. For some time, significant structural repairs and other updates were needed for the Eccles Building. Similarly, the vacant and dilapidated 1951 Constitution Avenue Building, across the street from the Eccles Building, needed significant repairs and updating. Despite its condition, the 1951 Constitution Avenue Building provided an opportunity for the Board to consolidate its operations and reduce expenses over time on leased space in commercial office buildings elsewhere. In 2017, the General Services Administration (GSA) approached us about our interest in taking over the 1951 Constitution Avenue Building. In 2018, GSA transferred sole control of the 1951 Constitution Avenue Building to the Board. In a press release announcing the transfer in 2018, GSA's Public Buildings Service Commissioner stated "This transfer will put a vacant building back in productive use, allow the Federal Reserve Board to consolidate several leases and result in savings for taxpayers."2 To address the significant state of disrepair and unsafe working conditions, the Board is undertaking a complete overhaul and modernization of these two historic buildings. This includes remediation and updates to make the buildings safe, healthy, and effective places to work by removing asbestos and lead contamination and accommodating modern workplace technology. The project has also involved the complete replacement of antiquated systems that are beyond their useful life, such as electrical; plumbing; heating, ventilation, and air conditioning; and fire detection and suppression systems. As part of the project, the Board has undertaken major structural work to bring the buildings up to modern code, including current accessibility, security, and safety standards. Throughout the process, the Board chose to consult with a range of state and federal agencies including the Commission on Fine Arts, the District of Columbia's Public Space Committee and its State Historic Preservation Office, the National Park Service, and the National Capital Planning Commission (NCPC). As discussed in the enclosed FAQs, although the Board is generally not subject to the jurisdiction of the NCPC, historically the Board has submitted building project designs to the NCPC and worked with the NCPC to address their feedback. In recognition of the historic nature of both buildings and their prominent location on the National Mall, the project identified key architectural features to preserve the historic integrity of the buildings, such as stonework, including marble, façades, meeting rooms, and other spaces. Historic preservation work in the Eccles Building also includes elevators that are original to the building, and historic conference rooms. Construction involving the preservation of historic spaces requires specialized processes and methods, which are generally more complex and have increased costs compared with new construction or renovation of spaces that are not historically significant or located on the National Mall. Various factors drove cost increases following the NCPC's final approval of site and building plans in 2021. These factors include differences over time between original estimates and actual costs of materials, equipment, and labor, and unforeseen conditions in the properties, such as more asbestos than anticipated, toxic contamination in the soil, and a higher-than- expected water table. As is to be expected in the major renovation of nearly 100-year-old historic buildings, the Board's designs have continued to evolve over the course of the project, and some features of the buildings, including rooftop spaces and new water features on the building grounds, were scaled back or eliminated as the project moved forward. These changes simplified the project and reduced the likelihood of further delays and cost overruns. None of them added cost to the project. We do not consider these changes to be substantial. With respect to the specific concerns that were discussed at the hearing, I would like to provide additional detail regarding various elements of the project: • The Eccles and 1951 Constitution Avenue buildings were originally built with marble in the façades and stonework. The project has salvaged the original exterior marble to be reinstalled and will use new domestic marble sourced from Georgia in places where the original was damaged or where needed to keep with historic preservation guidelines and to address concerns raised by external review agencies. • The original elevators are being rehabilitated, including an elevator that services historic conference rooms. A short (eighteen inch) extension of this rehabilitated elevator will make the space more accessible for people with disabilities. There are no elevators where access is limited to governors. There are no VIP dining rooms being constructed as part of the project. The Eccles Building has historic multi-use rooms that are used as conference rooms and for mealtime meetings, which are being renovated and preserved. • Although the Board's initial design included new water features for 1951 Constitution Avenue, they have been eliminated. Fountains that were original to the Eccles Building are being restored. • The ground-level front lawn of 1951 Constitution Avenue serves as the roof of the parking structure beneath. It was referred to as a "garden terrace" in the 2021 submission to the National Capital Planning Commission. There are other references to "vegetated roofs," often referred to as green roofs, which are commonly used to help with stormwater management and to increase building efficiency and roof longevity. Green roofs are found on other federal government buildings, like the Departments of Justice, Interior, and many others, and are encouraged by the General Services Administration.3 We take seriously the responsibility to be good stewards of public resources as we fulfill the duties given to us by Congress on behalf of the American people. We have taken great care to ensure the project is carefully overseen since it was first approved by the Board in 2017. The project has been subject to annual budget approval by the Board since then. In addition to oversight by members of the Board, our independent Inspector General (IG) has had full access to project information on costs, contracts, schedules, and expenditures and receives monthly reports on the construction program. The Board's IG conducted an audit in 2021 to assess the Board's process for planning and managing multiple renovation projects as well as procuring services under various renovation-related contracts. I have asked the Board's IG to take a fresh look at the project. I hope you find this additional information helpful. Sincerely, Jerome H Powell Read the original article on Business Insider

3h
3 min
0
Read Article
US Justice Department Investigates Fed Chair Powell
Politics

US Justice Department Investigates Fed Chair Powell

A US justice department investigation into Federal Reserve Chair Jay Powell's testimony is raising fundamental questions about the independence of the country's judicial arm and the integrity of its central banking leadership.

3h
5 min
18
Read Article
El Helicoide: Inside Venezuela's Notorious Torture Prison
Politics

El Helicoide: Inside Venezuela's Notorious Torture Prison

Inside the brutal El Helicoide jail, families are calling for the release of political prisoners held in Venezuela's most notorious facility.

3h
5 min
15
Read Article
Thailand Crane Collapse: Fatal Train Disaster
Accidents

Thailand Crane Collapse: Fatal Train Disaster

A routine journey from Bangkok turned tragic when a crane collapsed onto a high-speed passenger train. Emergency crews responded to the catastrophic scene as several lives were lost.

3h
5 min
23
Read Article
Accidents

Crane Collapses on Thai Train, Killing 22

A passenger train traveling from Bangkok to Thailand's northeast was derailed Wednesday morning when a construction crane collapsed onto one of its carriages, resulting in significant casualties.

4h
5 min
25
Read Article
Accidents

Train Crane Collapse in Thailand Kills 22

A catastrophic crane collapse onto a moving train in northern Thailand has resulted in at least 22 fatalities and over 30 injuries, marking a dark day for the nation's transport safety.

4h
5 min
18
Read Article
Kiefer Sutherland Arrested in Hollywood Ride-Sharing Incident
Entertainment

Kiefer Sutherland Arrested in Hollywood Ride-Sharing Incident

Investigators arrested the actor, star of '24' and 'Designated Survivor', in Hollywood early on Monday morning following an alleged assault involving a ride-share driver.

4h
5 min
20
Read Article
🎉

You're all caught up!

Check back later for more stories

Back to Home